Introduction
Building a house in Bengaluru requires more than a good floor plan. Property documents, building-plan permission and other applicable clearances should be checked before construction starts. Requirements can vary according to the location, plot size, building type and applicable authority.
1. Property and Khata Documents
Keep the sale/title deed, latest Khata certificate and extract, property-tax paid receipt and Encumbrance Certificate ready. A land-conversion document may also be required where applicable. BBMP’s published service information lists these documents for certain residential building-plan applications.
2. Building Plan Approval
The proposed house plan needs approval from the competent local authority. The plan should comply with applicable zoning rules, setbacks, FAR, site coverage and building bye-laws. Do not start construction based only on an architect’s drawing without confirming the required sanction.
3. Architect and Structural Engineer
Use a qualified architect or registered building professional for the drawings and a competent structural engineer for the structural design. Professional supervision is also required under applicable sanction conditions.
4. Commencement Requirements
Depending on the project and approval, a commencement certificate or required commencement intimation may apply before certain stages of construction. BBMP sanction conditions include obtaining a commencement certificate after foundation/footing work and before specified subsequent structural work.
5. Additional NOCs
Not every independent house needs every NOC. Additional clearances can depend on building height, location, land use and project characteristics. Larger or higher buildings may require fire-safety and other departmental clearances. Your architect should identify the NOCs applicable to your site.
6. Rainwater Harvesting
Applicable building requirements can include rainwater-harvesting provisions and other infrastructure conditions. These should be incorporated into the house design from the beginning.
7. Occupancy Certificate
After construction, check whether an Occupancy Certificate is required for your building and obtain it before occupation where applicable. BBMP sanction conditions state that buildings should not be occupied without the required occupancy certificate from the competent authority.
Documents Checklist
• Sale deed / title document
• Latest Khata certificate and extract
• Latest property-tax receipt
• Encumbrance Certificate
• Conversion document, where applicable
• Architectural drawings
• Structural drawings
• Required application forms, affidavits and undertakings
• Applicable NOCs and clearances
Final Takeaway
The safest approach is to verify the property documents first, have the plan prepared by qualified professionals, obtain the applicable building approval before construction, follow the sanctioned plan during execution and complete the required formalities before occupation. Since procedures and rules can change, confirm the current requirements with the competent local authority and your architect before starting work.